Piping
• Plant layout & plot plan
• MTO (bill of materials)
• Equipment modelling (3d & 2d)
• Pipe routing (3d & 2d)
• Drafting (AUTOCAD & MICROSTATION)
• Pipe supporting
• General arrangement drawing
• Isometric production & checking
Electical
• Plant layout & plot plan
• MTO (bill of materials)
• Equipment modelling (3d & 2d)
• Pipe routing (3d & 2d)
• Drafting (AUTOCAD & MICROSTATION)
• Pipe supporting
• General arrangement drawing
• Isometric production & checking
Pipe Flexibility Calculation
• Critical line list
• Model piping systems in Caeser II
• Analyze piping system in Caeser II
• Extract Report from Caeser II
Structure
• 3D modelling of plant structure
• Fabrication drawings
• Pipe support calculation
Training
• E3D
• Smart Plant 3D
• Autoplant 3D
• Autocad
Mechanical
• Data sheets preparation
• Package specifications
• Review vendor packages drawing
• 3D modelling of packages
• Bid preparation
Instrumentations
• Instrument Index/IO list
• Sizing calculations for flow elements and control valves
• Specifications
• 3D modelling
• Data sheets
Fabrication
• Modular skids
• Overall skid modelling
• Skid drawings
• Equipment & piping modelling
• Skid cost estimate